Infrastructure facilities:

a) Power: Total Connected load of power estimated is 3 HP. The entrepreneur has already confirmed the availability from KSE B.

b) Water: Water is required for soaking, cleaning and general purpose and it is available in plenty near to the site.

c) Transport: The proposed site is located on the side of road.

d) Labour: A total of 3 workers are required in addition to the promoter. All these skilled and unskilled workers can be recruited locally.

e) Others: Telephone and Postal facilities are also available nearby.