RAW MATERIALS.

The raw materials needed include fabrics of different kinds and other sewing materials. They are easily available and care will be taken on the quality of the same.

POWER

The total connected load required for running the unit is estimated as 2 H.P. only- single phase.

MANUFACTURING PROCESS.

The clothing are taken and cut to required design. Then they are stitched together to form the product. The necessary buttons, zibs, hooks etc are fixed and it is then taken to ironing and ready for sale. The embroidery works are carried out if necessary.

MARKETING.

The marketing of any product is the decision making factor of the existence of the unit and on considering that the promoter has taken all the possible ways for marketing such as direct sales and personal contacts etc. In fact the promoter had made a wide network of marketing for the last one year and is capable for the forthcoming years also. The marketing area is concentrated in retail shops of small towns and there are a number of dealers through which the product can be sold. Most care will be taken in the change of fashion and trends as they are much affected in the field of ready-made garments.

MODE OF FINACE

The promoter expects financial assistance from leading nationalized branch. This unit will be financed under ESS scheme and eligible for 40% subsidy of total fixed investment .

ASSUMPTION

It is assumed that there will not be any major increase in the rate of raw material and any major changes in prices will be compensated with corresponding change in product.

CONCLUSION

On revealing the various aspects of the project and studying the financial & technical features of the scheme it can easily be noted that the above project will be a great success. The economics of the project is detailed as follows.